Snapshot of Gladstone Station - September 20, 2020

glad3

They build a new access road to the north of the station. Not really sure why... Also, the trench is being dug out under the 417! 

Continue reading
Tags:

Snapshot of Gladstone Station - October 18, 2020

glad22

 Future Gladstone Station excavations complete and temporarily filled with water. You can see the Comms conduit sinking on the right-hand side.

Continue reading
Tags:

Snapshot of Gladstone Station - October 4, 2020

glad2

 Double track Gladstone Station excavation work completed

All the rubble that filled the Trillium Line trench under the Queensway Bridge, for its 60 year demolition and replacement this this summer has now been removed. Is the trench wide enough for double track here, with subsurface drainage, or more rock widening needed?
Continue reading
Tags:

Snapshot of Gladstone Station - September 14, 2020

glad1
Continue reading
Tags:

Snapshot of Gladstone Station - July 17, 2020

g1
Continue reading
Tags:

Snapshot of Gladstone Station - July 7, 2020

glads1
Continue reading
Tags:

Snapshot of Gladstone Station - June 29, 2020

glad1
Continue reading
Tags:

Snapshot of Gladstone Station - July 29, 2020

glad1

East side blasting of Gladstone double track/platform for the Trillium Line's Stage 2 station is complete, now moving on to west side blasting and excavation. The white Standard Bread will become high rise residential.

Continue reading
Tags:

Snapshot of Gladstone Station - June 22, 2020

gs7
Lifted Trillium Line Stage 2 tracks near Young St. Trench now filled in to allow for old 1960s demolition and movement of new Queensway Bridge next week. It was extra long for planned Champagne Expy from Airport Parkway to Bayview and beyond.
New Gladstone Station Stage 2 blasting to widen trench. New bridge over trench seen in second image. Was some rubble used as temporary fill in trench for demolition of Queensway Bridge next week?
Continue reading
Tags:

Snapshot of Gladstone Station - June 16, 2020

gladstone-4
Construction at Gladstone Station continues with rock cutting and blasting.
Continue reading
Tags:

Snapshot of Gladstone Station - June 5, 2020

gladstone1
Looking North at the future site of Gladstone Station. Tarps have been placed over the soon to be constructed Northbound tracks.
Looking south at the Highway 417 overpass. The rails have been removed and the underpass is now blocked by rocks at the far end.
Continue reading
Tags:

Snapshot of Gladstone Station - May 30, 2020

20200530_4
Gladstone Station, from the beginning of the MUP detour looking south. Topsoil has been excavated down to bedrock along East of tracks.
Dug trench along the East edge of the former MUP looking south.
Looking West from the MUP detour across the recently contructed staging area towards the future Gladstone Station.
Looking North from the Gladstone Ave. Bridge. Some top soil removed and tracks are removed.
Continue reading
Tags:

Snapshot of Gladstone Station - January 8, 2020

C3A29CA9-F611-411F-93F5-75E711B28027

In this snapshot update for Stage 2 LRT, we take a look at Gladstone Station, along the Trillium Line South Extension, and discuss what will change, and what is to come over the next few years.

Looking down Gladstone towards the East. The station entrance and plaza will be located on the left side of the overpass (where the curved fence currently stands).
Looking down from the overpass to the tracks. The double tracking will be extended into the station and slightly beyond to the Queensway underpass. The station will feature two side platforms.
Another view of the future station entrance and plaza.
Looking southbound on the Trillium Line, towards the next station, Carling.
The opposite side of the Gladstone overpass. Currently a busy site with construction work and staging to replace the Highway 417 Queensway overpass that crosses the Trillium Line tracks.
Continue reading
Tags: