Walkley Station will be a new station located south of Walkley Road adjacent to commercial property to the east. The station will front onto Walkley Road east of the South East Transitway Station and will consist of stairs and elevators from the entrance to the platform within the fare paid zone. It will include a combination of signage, architectural elements, and landscape features directly adjacent to Walkley Road to clearly announce the station location from Walkley Road.
Walkley Station building has now reached street level. Long platforms to accommodate new FLIRT and the double Coradia LINT trains. Note orange tarps and heaters to protect concrete from cold and frost.
Looking from Walkley Bridge towards new VIA Brookfield flyover, this stretch will be one of the Trillium Line enhanced passing sidings, a bit longer than before.
Progress with the entry building and elevator foundation at the new Trillium Line tage 2 Walkley Station. Note the TOD apartments in the background getting taller.
Yesterday, some shots of the deep foundations for the single track platform for new Walkley Station. New high rise TOD in background
Walkley Station advances with construction on the new platform. Upcoming work will require lane closures on the Walkley Road overpass in the near future.
Future Walkley Station as seen from the Walkley overpass. The foundation of the station platform can be seen under construction in the middle of the photo. Track and guideway will be found to the right.
Progress at new Walkley Station on Trillium Line Stage 2. Note high rise construction crane for new residential tower, deep one-side platform foundation, and new aggregate base for the entry plaza.